Suggestions

Du même auteur

Evaluation of land surface model simulations of evapotranspiration over a 12-year crop succession: impact of soil hydraulic and vegetation properties

Archive ouverte | Garrigues, Sébastien | CCSD

International audience

Multi-year assessment of a land surface model: Impact of the uncertainty on soil parameters on the evapotranpiration of a mediterranean crop site

Archive ouverte | Garrigues, Sébastien | CCSD

International audience

Evaluation of land surface model simulations of evapotranspiration over a 12 year crop succession: impact of the soil hydraulic properties

Archive ouverte | Garrigues, Sébastien | CCSD

Evapotranspiration has been recognized as one of the most uncertain term in the surface water balance simulated by land surface models. In this study, the SURFEX/ISBAA- gs simulations of evapotranspiration are assessed at local sc...

Chargement des enrichissements...